Jizan Hospital construction project, owned by the Saudi Ministry of Health
500-bed hospital project in Jizan, owner: Saudi Ministry of Health.
A contract was made to provide some technical support for the project, which is as follows: – Preparing the structural calculation notes for the entire main building and correcting design errors in the structural design. – Carrying out the construction executive plans for the main building and service buildings, while following up on the appropriations with the consultant, Khatib and Alami Office.
The contractor al fawzan
Yanbu Women's College
Preparing the structural calculation notes for the entire building and correcting design errors in the structural design. – Carrying out foundation redesign work according to the current situation and the condition of the site after excavation work and modification of the foundations.
Carrying out structural design work for water tanks and concrete retaining walls
Administrative Building No. 42, Taibah University, Medina
Project of Administrative Building No. 42 at Taibah University in Medina:The main contractor is Al-Harbi Contracting Company and the owner is Taibah University in Medina.
A contract was made to provide some technical support for the project, which is as follows: – Preparing the structural calculation notes for the entire building and correcting design errors in the structural design. – Carrying out foundation redesign work according to the current situation and the condition of the site after excavation work and modification of the foundations.
Carrying out structural design work for water tanks and concrete retaining walls
Carrying out structural design work for water tanks and concrete retaining walls
Project No. 440 for Ministry of Health
Project No. 440 of the Ministry of Health’s dispensaries for 250 locations throughout the Kingdom. The owner is the Ministry of Health, under the supervision of Zuhair Fayez’s office.
A contract was made to provide technical support for the project and the works are as follows:
Preparing all executive plans for all architectural, structural, electrical, and mechanical works and bills of quantities, along with submitting all design calculations for ten different models (the architectural and construction works have been completed). – Preparing general site plans for 250 sites.
The project consists of ten different models of health units implemented in several locations
All work was completed with approval from the consultant Zuhair Fayez Office
The Palace project, Dar Al Arkan
Participation in a 60-hour workshop as a value engineering engineer to evaluate the commercial mall building in the Al-Malik Palace project, Dar Al-Arkan, and Turner project management, in partnership with Al-Atshian Office.
A contract is currently underway to prepare executive plans for power station projects with one of the companies specialized in implementing power stations.